New Material 800g 1000g 1200g Composite Geomembrane Membrane, Two Fabrics, One Membrane, One Fabric, One Membrane
|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Until 100% Satisfaction |
| Warranty: | at Least 30 Years |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
360° Virtual Tour
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ISO9001:2015 certificate
Find Similar Products
Basic Info.
- Model NO.
- 300-2000g
- Color
- White
- Application
- Electrical Engineering, Roads & Railways & Airports Project, Water Conservancy Project, Geotechnical and Environmental Engineering
- Function
- Reinforcement, Drainage, Seepage Prevention
- Classification
- Composite Impervious Geomembrane
- Material
- HDPE
- Type
- Composite Geomembrane
- Surface
- Smooth
- Width
- 1-8 Meters
- Length
- Customizable
- Characteristic
- Isolation, Drainage, Reinforcement
- Types of
- Two Layers of Geotextile and One Layer of Geotexti
- Transport Package
- Export Special Packaging
- Specification
- customizable
- Trademark
- Sentai
- Origin
- Dezhou City, Shandong Province
- HS Code
- 5603149000
- Production Capacity
- 400000/Year
Packaging & Delivery
- Package Size
- 605.00cm * 55.00cm * 55.00cm
- Package Gross Weight
- 300.000kg
Product Description
|
Unit weight g/m2
|
400 | 500 | 600 | 700 | 800 | 900 | 1000 | Remarks |
| Project | ||||||||
| Thickness of Membrane(mm) | 0.25-0.35 | 0.3~0.5 | ||||||
|
Breaking Strength KN/m
|
5
|
7.5
|
10.0
|
12.0
|
14.0
|
16.0
|
18.0
|
MD and CD |
| Elongation at Break % | 30~100 | |||||||
|
CBR Mullen Burst Strength KN≥
|
1.1
|
1.5
|
1.9
|
2.2
|
2.5
|
2.8
|
3.0
|
MD and CD |
|
Tear Strength KN≥
|
0.15
|
0.25
|
0.32
|
0.4
|
0.48
|
0.56
|
0.62
|
|
|
Peel Strength N/cm
|
6
|
|||||||
|
Vertical Permeability Coefficient cm/s
|
K×10-11~-13
|
K=1.0-0.9
|
||||||
Construction precautions
On the contact surface with the membrane, a layer of sand or clay with small particle size should be laid as a protective layer, and the thickness of the protective layer should not be less than 30 cm.
1. Lay in a certain direction, but do not pull too tightly. Leave a certain amount of expansion and contraction to adapt to the deformation of the substrate.
2. A PE film with a certain width reserved on both sides of the geotextile and a non adhesive layer of PET fabric (i.e. edge throwing) should be laid. When laying, the direction of each unit of geotextile should be adjusted to facilitate the welding of the two unit geotextiles
3. After laying the geomembrane, it should be pressed with a sandbag to prevent wind and sand from affecting the welding of the edge of the geomembrane in the next step
4. Geomembrane welding. Joint treatment is a key construction procedure, usually using hot welding method. The surface of the PE film is heated to melt, and then fused into a whole through pressure
5. For the laid geomembrane, the edge joints must be free of oil, water, dust, etc
6. Before welding, adjust the two sides of the PE single film at the joint to overlap a certain width, which is generally 6-8 cm and flat without wrinkles
7. Use a dedicated welding machine for welding
Application field of composite geomembrane

Texas Sentai Environmental Protection Technology Co., Ltd. covers an area of 50 acres, with nearly 100 employees and more than 50 professional and technical personnel. We are an environmental protection technology oriented enterprise mainly engaged in the production of a series of new geosynthetic materials, specializing in the design and research and development of geosynthetic materials application, specialized production and manufacturing, construction design services, and system solution services for infrastructure construction projects such as transportation, water conservancy, environmental protection, ecological restoration, environmental governance, municipal construction, and animal husbandry. Our main products include various types of geosynthetic fabrics, geosynthetic membranes, and composite geosynthetic membranes





Frequently asked questions
Q1: What is your delivery time?
A1: If there is inventory, it usually takes 3-7 days. Or if the goods are out of stock, it will take 10-15 days, depending on the quantity.
Q2: Where is your company?
A2: Dezhou, Shandong Province, China. If you would like to come, please call me and I will arrange your schedule.
Q3: Are you a trading company or a manufacturer?
A3: We are manufacturers. So our prices are lower than those of trading companies.
Q4: What is your delivery method?
A4: Telegraphic transfer, PayPal
Q5: Do you provide samples? Is it free or extra?
A5: Yes, we can provide samples for free, but we do not pay for shipping.
Q6: What are your payment terms?
A6: Payment<=$1000, 100% in advance. Payment>=$1000, 30% advance T/T, balance before shipment. If you have any other questions, please contact me.
Send your message to this supplier
People who viewed this also viewed
Product Groups
Find Similar Products By Category
- Supplier Homepage
- Products
- Composite geomembrane
- Two cloths and one film
- New Material 800g 1000g 1200g Composite Geomembrane Membrane, Two Fabrics, One Membrane, One Fabric, One Membrane